When a cath lab goes out of service for renovation, the team may have to choose a temporary room layout weeks before it can walk through that room. A drawing helps answer where equipment goes. It is harder to tell from the drawing what happens when two people need the same patch of floor at once, or when the assigned layout places a frequently used item behind another workstation.
A simple room mock-up can bring those questions forward. Use it to compare two practical ways of arranging the work, then carry the winning arrangement and the unresolved questions into the review of the installed unit. The objective is to learn which assumptions deserve a check while there is time to change them.
Choose one decision you can still change
Give the exercise a specific question: “Can the second person enter the room and reach their working position while the first is setting up?” or “Which side lets the team bring in a backup cart without asking someone else to move?” A rehearsal with a well-defined question helps the team make a decision. A general tour tends to produce a list of impressions.
Start with the most recent drawing for the proposed or assigned unit. Record the revision and distinguish fixed features from movable items. A wall, doorway or fixed console is a constraint on the drawing. A cart location sketched by the project team is a proposal. Mark any dimension, equipment position or opening that has not been verified; use a provisional layout to discover questions, and bring those questions back to the assigned unit's documentation.
Build just enough of the room to learn something
Use a suitable space away from patient care. With the facility team's agreement, mark the room boundary, door swing and main fixed footprints at scale. Use the actual dimensions of the hospital's mobile items, or use clean stand-ins with the same footprint. Include parts that change the working envelope, such as a handle or a drawer that needs room to open. Keep real medical devices out of use during the exercise unless the hospital has arranged an appropriate simulation.
Represent anything the mock-up cannot show with a clear label. A tape line can mark where a door swings, but it cannot reproduce the handle, threshold or weight of the door. A taped imaging-system footprint does not establish how the actual system moves. Keep those differences visible so a useful early test does not become a false acceptance decision.
Rehearse the moment that puts the layout under pressure
Walk through a short sequence with the staff roles who would actually use the space. For example, start with one person at the intended workstation and a second person bringing in a stand-in for an equipment cart. Give each person a simple task using only routine movement. Have someone outside the exercise note where people pause, turn sideways, step back or ask someone to move. No patient or clinical procedure is needed to test those movements.
Then change one thing and run the same sequence again. Move the proposed staging location, for example, while leaving the route and the roles unchanged. This comparison helps answer whether the alternate location removes the conflict or sends it somewhere else. Ask each participant what they expected to happen and what they actually had to do.
Turn observations into decisions the project team can use
Suppose the team prefers a cart next to the door for an easy arrival, but a second participant must cross the cart's footprint to reach their work position. Relocating the cart might solve that problem and make it harder to reach a drawer. Write down both observations and compare the two arrangements. Identify exactly which doorway, position or item needs confirmation. “Move the cart if practical” leaves the next team guessing; “check whether the measured cart can park in location B with the drawer open” gives them a test.
At the end, capture three things: the proposed arrangement, the observation that supports it, and the person who will verify the outstanding measurement or condition. Attach the marked-up drawing to that note. If no arrangement works in the mock-up, ask whether the hospital can use a different item or needs to reconsider the proposed room arrangement before committing.
Check the result again in the assigned unit
Take the marked drawing into the actual temporary room with the hospital's responsible teams. Confirm fixed features, working positions and equipment movements against the assigned configuration and current documentation. Have the team repeat the one scenario that originally exposed the conflict. Resolve any remaining questions through the hospital's normal facilities, clinical and equipment review. The pre-delivery exercise helps direct that review; it does not establish clinical readiness, engineering acceptance or code compliance.
The AHRQ-funded operating room design research report documents staged mock-ups, from tape layouts to full-scale prototypes, and uses simulation findings to inform redesign. AHRQ's workflow simulation resource also describes observation, debrief and evaluation. Applying those principles to a temporary cath room is a planning exercise; the hospital sets its own review and acceptance requirements.
If you're planning temporary cath capacity during a renovation or system replacement, contact Atlas Medical with your project timing, the proposed room drawing and the one layout question your team wants to resolve first.